Shield Cases Other Types of Equipment : ETS Lindgren 5407 GTEM

此产品是工厂翻新

ETS-Lindgren 5407 GTEM
放大图片ETS-Lindgren 5407 GTEM

Call 1-800-615-8378 for more information

Request a Quote

Check Rental Availability

省钱-购买二手设备


EMC Test Cell.

Beginning with design qualification testing and moving through to pre-compliance testing, full compliance testing and production sampling, ETS-Lindgren GTEM Test Cell is a time saving device for your test lab. A typical radiated emissions test (10,000 point scan) can be completed in 15 minutes or less, while a typical radiated immunity test can usually be completed in half the normal time.


The GTEM!™ Test Cell is based on experience, not experimentation. Originally developed in the EMC Baden (Switzerland) labs of ABB, the cell has been accepted in the EMC community for more than 10 years, and is field proven daily at more than 400 installations worldwide. Measurements made with a GTEM!™ Test Cell are accepted for final compliance demonstration by the FCC for Part 15 & 18 radiated emissions testing, and comply with IEC 61000-4-3 Annex D for immunity testing. The GTEM!™'s unique tapered shape, offset septum, resistive termination network and absorber- lined back wall remove performance limitations of TEM cells and boxy enclosures. Electromagnetic wave and RF current termination are smooth and controlled. Field uniformity is +/- 3 dB up to 1 GHz, and +/-4 dB above 1 GHz.

  • 制造商: ETS Lindgren
  • 模型: 5407 GTEM